---
title: "U-tapao airport plan cut to 10 billion baht first phase for 3 million passengers"
description: "U-Tapao International Aviation will build a 10-billion-baht first phase for 3 million passengers a year, due by 2031, without waiting for the rail link."
url: https://bestofthailand.org/news/u-tapao-airport-plan-cut-to-10-billion-baht-first-phase-for-3-million-passengers
locale: en
---

# U-tapao airport plan cut to 10 billion baht first phase for 3 million passengers

Travel · November 24, 2026

[By Cesar Rodriguez](https://bestofthailand.org/author)Updated 24 November 2026

U-Tapao International Aviation will build a 10-billion-baht first phase for 3 million passengers a year, due by 2031, without waiting for the rail link.

![U-tapao airport plan cut to 10 billion baht first phase for 3 million passengers](https://bestofthailand.org/images/news-travel.jpg)

U-Tapao International Aviation has scaled back the first phase of the airport near Pattaya to about 10 billion baht, roughly 70% less than first planned, and to 3 million passengers a year instead of 10 million. Bangkok Airways president Puttipong Prasarttong-Osoth said the company has a notice to proceed from the Eastern Economic Corridor and will start without waiting for the delayed high-speed rail line. Completion is set for 2031.

The developer is also negotiating with the Royal Thai Navy to take over management of the existing Terminal 2 and bring in more airlines. The long-term target under the 50-year concession stays at 60 million passengers.

Separately, Bangkok Airways will spend 3 billion baht upgrading Samui Airport from early 2027 to 2030, raising capacity from nearly 3 million to 6 million passengers and 73 flights a day.

Source: [Bangkok Post](https://www.bangkokpost.com/business/general/3360069/utapao-forges-ahead-with-terminal-and-airport-expansion). Summary written by Best of Thailand; read the original for the full report.

## More news

**[Purple and Red Line 40-baht daily cap extended to 31 December 2027](https://bestofthailand.org/news/purple-red-line-40-baht-daily-cap-extended-to-december-2027)** — ![Purple and Red Line 40-baht daily cap extended to 31 December 2027](https://bestofthailand.org/images/news-transport.jpg) — Transport · Nov 24, 2026 — The 40-baht daily fare on the Purple and Red Lines, due to end on 30 November 2026, now runs from 1 December 2026 to 31 December 2027.

**[AOT net profit rises 6.5% to 19.31 billion baht on higher departure fee](https://bestofthailand.org/news/aot-net-profit-rises-6-5-to-19-31-billion-baht-on-higher-departure-fee)** — ![AOT net profit rises 6.5% to 19.31 billion baht on higher departure fee](https://bestofthailand.org/images/news-city.jpg) — Business · Nov 24, 2026 — Airports of Thailand earned 19.31 billion baht in fiscal 2026 as a 1,120-baht international departure charge offset a 10.7% drop in concession income.

**[CP-Meiji to spend 4.8 billion baht on third dairy plant in Saraburi](https://bestofthailand.org/news/cp-meiji-to-spend-4-8-billion-baht-on-third-dairy-plant-in-saraburi)** — ![CP-Meiji to spend 4.8 billion baht on third dairy plant in Saraburi](https://bestofthailand.org/images/news-city.jpg) — Business · Nov 24, 2026 — CP-Meiji's new Saraburi plant will lift annual capacity from 450,000 to 700,000 tonnes when it starts operating in 2030.
